Chongqing Tongxing Waste-to-Energy Power Plant
Capacity: 1200 tpd (2*600 tpd)
Intalled capacity: 2*12MW
The first BOT mode Waste-to-Energy project
Capacity: 1200 tpd (2*600 tpd)
Intalled capacity: 2*12MW
The first BOT mode Waste-to-Energy project