Location | Home > News&Information > News
News News

Chongqing Wulong Waste-to-Energy Power Plant Project Has Connected to the Grid for Power Generation

December, 17th, 2021, Chongqing Wulong Waste-to-Energy power plant project, built by Sanfeng Covanta, has realized the first grid connection. 

12

Wulong Waste-to-Energy power plant project invested by Chongqing Sanfeng Environment Group is located in Wulong district, Chongqing, China. The capaciy is 900 t/d, divided into two phases of construction, the first phase of the project is 600 t/d, reserved the second phase of construction land. The first phase of the project is equipped with a 600 t/d reverse-acting grate manufactured by Sanfeng Covanta,medium temperature secondary high pressure heat recovery boiler and one set of 15MW turbine-generator. The flue gas purification treatment adopts the combined process of “SNCR furnace denitration, semi-dry reaction tower, dry deacidification (NaHCO3),  activated carbon adsorption and baghouse filter”, the emission can meet the current EU standard. Completely realize the “minimization” ”recycling” ”harmless” treatment of domestic waste.

12


上一篇:Steady Construction Progress Made in Macao Refuse Incineration Project

下一篇:Sanfeng Covanta EPC Project Won the 2020-2021 National High Quality Project Award