Sanfeng Covanta Signing the Contract of Equipment Supply for the Single Largest Waste Co-Incineration Project in Asia!
Chongqing Sanfeng Covanta Environmental Industry Co., Ltd. and Chengdu Xingrong Renewable Energy Co., Ltd. signed the Supply Contract of Waste Incinerator, Heat Recover Steam Generator (HRSG) and Auxiliary Equipment for Chengdu Wanxing Environmental Protection Power Plant (Phase III).
Chengdu Wanxing Environmental Protection Power Plant (Phase III) is located in Chang'an Venous Industrial Park, Chengdu, with a daily treatment capacity of 5,100 tons of municipal solid waste (MSW), 800 tons of kitchen waste and 800 tons of sludge (co-incineration of dried sludge and kitchen solid residue, with each incinerator capacity up to 960t/d). It will build six 850t/d MSW incineration lines with 3 sets of rated 55MW condensing steam turbine generator units. After the Project is completed and put into operation, it will further improve the MSW treatment capacity for Chengdu, help realize reduction, recycling and harmless treatment, and contribute to achieving the goal of full incineration power generation and zero landfill of MSW in Chengdu.
The official signing of the project has become a new highlight of ecological industry cooperation, dual-core joint construction and building upon each other’s complementary advantages between Chengdu and Chongqing. All peopleof Sanfeng Covanta will continue to fulfill the lofty mission of "For a Cleaner World", keep improving in the spirit of craftsmanship to deliver high-quality equipment that can withstand the test of history, and contribute to the building of "Zero-Waste City" in the Chengdu-Chongqing Economic Circle.